Skip to Main Content

Breadcrumb

  1. CPO
  2. Department of Transportation

Emergency Procurements 

In accordance with standards set by rule, a purchasing agency may make emergency procurements without competitive sealed bidding or prior notice when there exists a threat to public health or public safety, or when immediate expenditure is necessary for repairs to State property in order to protect against further loss of or damage to State property, to prevent or minimize serious disruption in critical State services that affect health, safety, or collection of substantial State revenues, or to ensure the integrity of State records.   Illinois Procurement Code (30 ILCS 500/20-30)  

Documentation for each emergency procurement can be viewed on the Transportation Procurement Bulletin on the Illinois Department of Transportation's website under Doing Business.

 

EA15-01Use SHIFT+ENTER to open the menu (new window).
8/6/2014Village of GlencoeRepair of Storm Sewer
EA14-09Use SHIFT+ENTER to open the menu (new window).
6/26/2014Benchmark Construction Co., Inc.Reconstruction of a catchbasin on I-290
$22,063.14
EA14-08Use SHIFT+ENTER to open the menu (new window).
4/30/2014Illinois Valley Paving, Division of United Contractors of the MidwestSink Hole Repair, I-55 frontage road, Glenarm
$80,110.32
EA14-07Use SHIFT+ENTER to open the menu (new window).
5/6/2014United Ready Mix, Inc.Pavement Repair Materials
$21,829.80
EA14-06Use SHIFT+ENTER to open the menu (new window).
2/18/2014Cross Construction, Inc.Pavement Repair Interstate 74, McLean, Piatt and Dewitt Counties
$672,828.94
EA14-05Use SHIFT+ENTER to open the menu (new window).
1/15/2014Advanced Asphalt CompanyPavement repair on  I-80
$4,171,147.67
EA14-04 AMENDEDUse SHIFT+ENTER to open the menu (new window).
1/13/2015Howell Paving, Inc.Pavement Repair
$3,154,009.87
EA14-03Use SHIFT+ENTER to open the menu (new window).
1/2/2014BBD Trucking, Efficient Trucking, Sunset CartageTransfer of salt within District 1
$211,133.75
EA14-02Use SHIFT+ENTER to open the menu (new window).
12/21/2013Traffic Control CompanyTraffic Control due to extensive pavement damage Marion County
$34,400.55
EA14-01Use SHIFT+ENTER to open the menu (new window).
8/1/2013Iroquois Paving CorporationBox Culvert Repair
$89,901.50
EA13-10Use SHIFT+ENTER to open the menu (new window).
7/1/2013Westfield Steel, Inc.Fire damage to a bridge located NB on I-55 at mile post 197
$21,443.72
EA13-09Use SHIFT+ENTER to open the menu (new window).
6/11/2013P.H. BroughtonHot mix asphalt material to repair pavement deterioration on I-55
$11,858.54
EA13-08Use SHIFT+ENTER to open the menu (new window).
6/11/2013Truman L. Flatt & SonsCost of hot mix asphalt material to repair pavement deterioration on I55
$25,863.27
EA13-07Use SHIFT+ENTER to open the menu (new window).
6/20/2013Halverson Construction Co., Inc.Extensive erosion IL Rt. 9 at the Spoon River, Fulton Co.
$494,661.53
EA13-06Use SHIFT+ENTER to open the menu (new window).
5/13/2013Martin &  Company ExcavatingSevere erosion due to flooding
$37,250.00
EA13-05Use SHIFT+ENTER to open the menu (new window).
4/27/2013Riverstone Group, Vermillion QuarryMaterials to repair erosion
$25,246.73
EA13-04Use SHIFT+ENTER to open the menu (new window).
4/26/2013Advanced Asphalt CompanyRepair of flood damage
$174,519.37
EA13-03Use SHIFT+ENTER to open the menu (new window).
10/22/2012D ConstructionGuardrail damage and significant erosion
$299,999.79
EA13-02Use SHIFT+ENTER to open the menu (new window).
10/11/2012G & G Steel and WireCo.Critical defects on a bridge  WireCo - $126,077.04    G&G Steel - $280,916.00
$406,993.04
EA13-01Use SHIFT+ENTER to open the menu (new window).
10/1/2012E. T. SimondsSlope stability problem and shoulder separation.
$550,258.66
EA12-10Use SHIFT+ENTER to open the menu (new window).
5/18/2012K-Five ConstructionTraffic Control for 2012 NATO conference in Chicago
$71,000.00
EA12-09Use SHIFT+ENTER to open the menu (new window).
4/17/2012Stark Excavating, Inc.Emergency highway patching
$129,043.41
EA12-08Use SHIFT+ENTER to open the menu (new window).
1/5/2012O'Brien Steel ServiceEmergency replacement of steel beams on bridge
$22,125.70
EA12-07Use SHIFT+ENTER to open the menu (new window).
11/28/2011G. M. SipesEmergency patching of I-80 EB driving Lane
$74,285.50
EA12-06Use SHIFT+ENTER to open the menu (new window).
10/26/2012Merz Heating and Air ConditioningReplacement of the HVAC systems
$18,250.00
AFF12-05Use SHIFT+ENTER to open the menu (new window).
11/2/2011Bodine Electric of DecaturReplacement of elecrical feeder line for rest area
$59,718.40
AFF12-04Use SHIFT+ENTER to open the menu (new window).
8/8/2012Bob Lamb Co.Repair to the main gear box which raises and lowers a lift bridge
$161,840.00
AFF12-03Use SHIFT+ENTER to open the menu (new window).
8/15/2011Fischer ExcavationDrainage structure debris removal, aggregate shoulder replacement
$567,916.00
AFF12-02Use SHIFT+ENTER to open the menu (new window).
8/16/2011Brandt ConstructionReplacement of several deck beams due to flash flooding
$241,671.00
AFF12-01Use SHIFT+ENTER to open the menu (new window).
8/6/2011Civil ConstructorsBituminous removal and replacement, bridge removal
$500,932.00
AFF11-11Use SHIFT+ENTER to open the menu (new window).
6/25/2011RoadsafeTraffic control on SB I90/94 after a sign truss was hit by a semi-trailer
$3,161.50
AFF11-10Use SHIFT+ENTER to open the menu (new window).
6/25/2011G. F. StructuresRemoval of sign truss SB I90/94 after being hit by a semi-trailer
$22,901.80
AFF11-09Use SHIFT+ENTER to open the menu (new window).
6/28/2011K. E. VasReplacement of the wearing surface of bridge
$72,934.90
AFF11-08Use SHIFT+ENTER to open the menu (new window).
6/27/2011Merz Heating and Air ConditioningReplacement of Air Conditioning system at rest area
$25,350.00
AFF11-07Use SHIFT+ENTER to open the menu (new window).
5/18/2011Civil Constructors Inc. of IllinoisEmergency repairs on a collapsed drain tile
$39,820.90
AFF11-06Use SHIFT+ENTER to open the menu (new window).
1/7/2011Bridge DiagnosticsMonitoring system  for two sinking bridge substructures
$133,647.00
AFF11-05Use SHIFT+ENTER to open the menu (new window).
12/6/2010RBR Inc.,d/b/a Breezy's Heating and ACHeating Unit Replacement
$12,953.50
AFF11-04Use SHIFT+ENTER to open the menu (new window).
11/5/2010HuckstorfRemoval of Debris "Toastmaster"
$424,775.43
AFF11-03Use SHIFT+ENTER to open the menu (new window).
10/18/2011Brandenburg Industrial ServicesEmergency Demolition "Toastmaster"
$77,193.10
AFF11-02Use SHIFT+ENTER to open the menu (new window).
9/10/2010Civil Constructors Inc. of IllinoisEmergency Culvert Repair
$31,034.50
AFF11-01Use SHIFT+ENTER to open the menu (new window).
8/2/2010Civil Constructors Inc. of IllinoisEmergency Bridge Repair
$325,432.00