AE Training Handbook 2020 | Documentation | A/E | Architect/Engineer |
CDB AE Error and Omission Policy Summary - April 2021 | Documentation | A/E | Contractor- A/E |
Bidding and Contract Requirements - Multiple Trade Advertisement for Bids REVISED 2020 07 08 | Documentation | Bidding | Contractor - Prospective Bidder |
Bidding and Contract Requirements - Section 00 11 13 Single Prime Advertisement for Bids | Documentation | Bidding | Contractor - Prospective Bidder |
| Documentation | Contract | Architect/Engineer |
Guidelines for Building Document Development | Documentation | Design - Build | Architect/Engineer |
Green Building Waiver Process for Projects | Documentation | Green Buildings | Architect/Engineer |
| Documentation | Other | Contractor- A/E |
Project Labor Agreements | Documentation | PLA | Contractor |
Acronym List | Documentation | Standard Document | Contractor- A/E |
330 Form Qualifications Based Submittal Forms | Form | A/E | Architect/Engineer |
A/E Electronic Submittal Form | Form | A/E | Architect/Engineer |
Request for State Building Inventory Number | Form | A/E | Architect/Engineer |
Professional Service Agreement - 2020 | Form | A/E Contract | Contractor- A/E |
Professional Services Qualifications | Form | Asbestos | Architect/Engineer |
Accreditation of Management Planner Form | Form | Asbestos | Architect/Engineer |
Asbestos Report | Form | Asbestos | Architect/Engineer |
Stockpiled ACM Information | Form | Asbestos | Architect/Engineer |
Bulk sample lab report | Form | Asbestos | Architect/Engineer |
FORM 11A - Point Counting Lab Analysis Report | Form | Asbestos | Architect/Engineer |
TEM Bulk Sample Lab Analysis Report | Form | Asbestos | Architect/Engineer |
Response Action Form | Form | Asbestos | Architect/Engineer |
Cost Summary of Response Action | Form | Asbestos | Architect/Engineer |
Chain of custody for Asbestos bulk sample | Form | Asbestos | Architect/Engineer |
Building Inventory | Form | Asbestos | Architect/Engineer |
Policy statement for management plan in minimizing the risk of exposure to asbestos fibers | Form | Asbestos | Architect/Engineer |
Management plan phase 3 (response action) | Form | Asbestos | Architect/Engineer |
Homogenous area inspecton report - form 9 | Form | Asbestos | Architect/Engineer |
Asbestos - Project Manager Daily Inspection Report | Form | Asbestos | Architect/Engineer |
Bidding and contract requirements | Form | Bidding | Contractor |
Bidding and Contract Requirements - 00665 MBE/WBE/PBE/VBE Subcontractor-Supplier Certification
| Form | Bidding | Architect/Engineer |
CDB certified payroll | Form | Certified Payroll | Contractor |
670 Form Subcontractor Add-Change v.21.1 | Form | Change Order | Contractor- A/E |
Change order proposal labor cost breakdown | Form | Change Order | Contractor |
Change order forms package (co proposal summary computations) | Form | Change Order | Contractor |
Change order proposal summary computations | Form | Change Order | Contractor |
Comptroller requirements for changing a contract after the ending date | Form | Change Order | Contractor |
Contractor proposal breakdown summary | Form | Change Order | Contractor |
Request for Proposal and Change Order Under The Subject Contract | Form | Change Order | Architect/Engineer |
A/E Final Close-out Package Checklist | Form | Close-out | Architect/Engineer |
Final Acceptance Certificate | Form | Close-out | Architect/Engineer |
Certificate of Operating and Training Instruction- Certificate Sheet Accompanying Substantial Completion Package
| Form | Close-out | Contractor |
Certificate of Substantial Completion | Form | Close-out | Architect/Engineer |
Guarantees, Warranties, and Bonds | Form | Close-out | Contractor |
Punch List - Attachment to Certificate of Substantial Completion | Form | Close-out | Architect/Engineer |
Final Waiver of Lien | Form | Close-out | Contractor |
Construction Management Serivces Agreement Form | Form | Construction Manager | Construction Manager |
Construction Manager Performance Evaluation Form | Form | Construction Manager | Contractor- A/E |
Contractor's Final Close-Out Package Checklist | Form | Contract | Contractor |
Illinois Works Apprenticeship Initiative Budget Supplement | Form | Contract | Contractor- A/E |
Illinois Works Apprenticeship Initiative Certification of Compliance Form_12.6.21 | Form | Contract | Contractor- A/E |
Illinois Works Apprenticeship Initiative Project Reporting Form | Form | Contract | Contractor- A/E |
Illinois Works Apprenticeship Initiative Project Waiver Reduction Form | Form | Contract | Contractor- A/E |
Request for Taxpayer Indentification Number and Certification | Form | Contract | Contractor- A/E |
Substance Abuse Prevention Program Certificate | Form | Contract | Contractor |
A/E Performance Evaluation - Design Phase | Form | Design | Architect/Engineer |
CDB Review Checklist 50% or 75% - Design Submittal | Form | Design | Architect/Engineer |
Design Submittal Checklist PA-DD | Form | Design | Architect/Engineer |
Workbook containing the life cycle of cost estimate form-included in the life cysle cost manual. | Form | Design | Architect/Engineer |
Project directory Between CDB and Contractors | Form | Design | Contractor- A/E |
Proposed project cost budget for CDB Project Manager | Form | Design | Architect/Engineer |
Addendum Format 00 91 REVISED 2020 04 21 - Electronic Bidding | Form | Design - 2006 to Present | Architect/Engineer |
Proposal Transmittal Form for Design-build Projects (DB-PTF) | Form | Design - Build | Contractor |
Design-build entity qualification statement (DBQ) -Submitted with phase 1 proposal | Form | Design - Build | Contractor |
DB.RFP. Pre-Proposal Inquiry Form | Form | Design - Build | Contractor |
Past Performance Evaluation | Form | Design - Build | Contractor |
Standard certifications - Standard business terms and conditions | Form | Disclosures & Certifications | Contractor- A/E |
Financial Disclosures and Conflict of Interest Forms | Form | Disclosures & Certifications | Contractor- A/E |
FORM A for bidders not registered in the Illinois Procurement Gateway (IPG) | Form | Disclosures & Certifications | Contractor |
Forms B | Form | Disclosures & Certifications | Contractor |
Standard certifications for subcontractors only | Form | Disclosures & Certifications | Contractor |
Emergency Purchase Statement - Notice of Award | Form | Emergency Projects | Contractor |
Performance Bond - Bidding and Contract Requirements | Form | Emergency Projects | Contractor |
Monthly Manpower Utlization Report Form | Form | FEP | Contractor |
Project Observation Report | Form | Field Report | Architect/Engineer |
Pre-engineered Metal Building -PBMC | Form | Metal Buildings | Architect/Engineer |
Contractor Performance Evaluation | Form | Other | Architect/Engineer |
Copy of A/E Payment Request Breakdown | Form | Pay Request | Architect/Engineer |
Copy of Contractor Affidavit Sworn Statement | Form | Pay Request | Contractor |
Contractors Schedule of values - CSV (Must be reviewed and approved for certification of payment) | Form | Pay Request | Contractor |
Invoice Voucher for Projects | Form | Pay Request | Contractor |
Request for Reduction of Retainage- Reduction from 10% to 5% Forms - 10/5 RRR | Form | Pay Request | Contractor |
Request for Reduction of Retainage- RRR (Must be accompanied by Consent of Surety) | Form | Pay Request | Contractor |
Stored Material Log Forms - Project Forms | Form | Pay Request | Contractor |
Partial Waiver of Lien to Date Form | Form | Pay Request | Contractor |
Construction Manager/Program Manager Prequalification Form
| Form | Prequalification | Construction Manager |
Contractor Prequal | Form | Prequalification | Contractor |
Vendor Registration for Vendors Planning to Bid Directly to The Prime Contractor | Form | Prequalification | Contractor |
Contractor's Final Declaration | Form | Procedures & Forms | Contractor |
MMUR Cover Sheet | Form | Procedures & Forms | Contractor |
Professional Services Agreement - 2019 | Form | Procedures & Forms | Architect/Engineer |
Roofing Manufacturers Modifications Certficate - for modifciations to roof systems under warranty | Form | Roofing | Architect/Engineer |
Roofing System Manufacturers Certificate | Form | Roofing | Architect/Engineer |
Roofing System Manufacturers Warranty | Form | Roofing | Architect/Engineer |
Roof Warranty - Non RSMW | Form | Roofing | Architect/Engineer |
Sales Tax Exemption Certificate Information | Letter | Sales Tax Exemption | Contractor |
Professional Services Bulletin - Current | Link | A/E | Architect/Engineer |
Bid information updates on current construction projects | Link | Bidding | Architect/Engineer |
AE Fee Ranges 12-11-2012 on New Construction | Manual | A/E | Architect/Engineer |
Centralized Fee Negotiation Professional Services and Fees Handbook-CDB Quality Program | Manual | A/E Contract | Architect/Engineer |
A&E Contracts Documents plus Design and Construction Guide for Architects and Engineers | Manual | A/E Contract | Architect/Engineer |
Remodeling Project Classification Basic Services Fee Compensation Range | Manual | A/E Contract | Architect/Engineer |
Supplement to Professional Services Agreement | Manual | Accessibility | Architect/Engineer |
Supplement to Professional Services Agreement | Manual | Asbestos | Architect/Engineer |
Meeting Attendance Record | Manual | Asbestos | Architect/Engineer |
Preparing detailed breakdown for change order proposals | Manual | Change Order | Contractor |
Standards document for construction - for projects with a construction manager | Manual | Construction Manager | Construction Manager |
Standards document for construction - for projects with a construction manager | Manual | Construction Manager | Construction Manager |
FAQ's Regarding Onsite Construction Activity | Manual | Contract | Contractor |
Design and Construction Manual - 2009 Supplement Eff. 11.2020 | Manual | Design | Architect/Engineer |
Supplement to Design and Construction Manual | Manual | Design | Architect/Engineer |
Life Cycle Cost Estimates | Manual | Design | Architect/Engineer |
Standards document for design-build projects-Baesd on 17th edition CDB standard documents for construction | Manual | Design - Build | Contractor |
Drawing cover sheet | Manual | Drawings | Architect/Engineer |
Project Manual Cover 2019 | Manual | Drawings | Architect/Engineer |
Small and Emergency Purchases - Exempt Competitive Bidding Requirements | Manual | Emergency Projects | Contractor- A/E |
Procedures and Forms - Construction phase | Manual | Procedures & Forms | Architect/Engineer |
Roofing Program Handbook | Manual | Roofing | Architect/Engineer |
Illinois Administration Code | Manual | Rules | Architect/Engineer |
Standard Documents for Construction | Manual | Standard Document | Contractor |
Supplement to Design Build SDC 1.2022 | Manual | Standard Document | Architect/Engineer |
Supplement to SDC and SDC CM 1.2022 | Manual | Standard Document | Architect/Engineer |
Roster of Accepted Roofing Systems Manufacturers | Roster | Metal Buildings | Architect/Engineer |
Fiberglass Shingles Roster of Accepted Roofing Systems Manufacturers | Roster | Roofing | Architect/Engineer |
Roster of Accepted Roofing Systems Manufacturers | Roster | Roofing | Architect/Engineer |
PVC roster of accepted roofing systems manufacturers
| Roster | Roofing | Architect/Engineer |
Asphalt Built-up Systems - Roster of Accepted Roofing Systems Manufacturers | Roster | Roofing | Architect/Engineer |
Modified Bitumen Systems Roster of Accepted Roofing Systems Manufacturers | Roster | Roofing | Contractor |
EPDM Systems roster of accepted roofing systems manufacturers | Roster | Roofing | Architect/Engineer |
TPO Roster of Accepted Roofing System Manufacturers | Roster | Roofing | Architect/Engineer |
Minor demolition for non-friable asbestos removal (non-ahera projects) | Specification | Asbestos | Architect/Engineer |
Minor demolition for non-friable asbestos roof removal
| Specification | Asbestos | Architect/Engineer |
Section 02 82 13 - Asbestos Abatement | Specification | Asbestos | Architect/Engineer |
Division 2 Exisiting Conditions- Excavations, Transportation and Disposal of Contaminated Soil | Specification | Design | Architect/Engineer |
Removal of Contaminated Groundwater | Specification | Design | Architect/Engineer |
PCB Containing Equipment Removal and Disposal
| Specification | Design | Architect/Engineer |
Above Ground Storage Tank Installation | Specification | Design | Architect/Engineer |
Division 00 Bidding and Contract Requirements 1.2022 | Specification | Design - 2014 to Present | Architect/Engineer |
Division 01 Specification Sections - Updated 1.2022 (For Multi-Prime and Single Trade Delivery Methods) | Specification | Design - 2014 to Present | Architect/Engineer |
Single Prime Division 0 Specifications - Updated 1.2022 (For Single Prime Delivery Method with Protected Subcontractors) | Specification | Design - 2014 to Present | Architect/Engineer |
Single Prime Division 1 Specifications - Updated 1.2022 (For Single Prime Delivery Methods) | Specification | Design - 2014 to Present | Architect/Engineer |
Thermal and Moisture Protection - Built-up Bituminous Roofing (Asphalt)
| Specification | Roofing | Architect/Engineer |
Thermal and Moisture Protection - Built-up Bituminous Roofing (Coal Tar Pitch)) | Specification | Roofing | Architect/Engineer |
Thermal and Moisture Protection - EPDM Membrane Roofing | Specification | Roofing | Architect/Engineer |
Thermal and Moisture Protection - Fiberglass and Tab Shingles | Specification | Roofing | Architect/Engineer |
Thermal and Moisture Protection - Fiberglass Laminated Shingles | Specification | Roofing | Architect/Engineer |
Thermal and Moisture Protection Fiberglass Shingles- Salt Domes | Specification | Roofing | Architect/Engineer |
Thermal and Moisture Protection Metal Shingles
| Specification | Roofing | Architect/Engineer |
General Requirements - Modifications to exisiting warranted roofing
| Specification | Roofing | Architect/Engineer |
Thermal and Moisture Protection - Modified Bitumen Roofing | Specification | Roofing | Architect/Engineer |
Thermal and Moisture Protection - PVC/ KEE Membrane Roofing | Specification | Roofing | Architect/Engineer |
Thermal and Moisture Protection Slate Shingles
| Specification | Roofing | Architect/Engineer |
Thermal and Moisture Protection - TPO Membrane Roofing | Specification | Roofing | Architect/Engineer |
Special construction- Pre-engineered metal buildings | Specification | Roofing | Architect/Engineer |
Thermal and Moisture Protection - Preformed Metal Roof Panels | Specification | Roofing | Architect/Engineer |
Basic Fee Ranges Table C 12.2021 | Table | A/E | Architect/Engineer |